What Happens Now?
My fire pit has arrived! Okay, don't panic; we've created this comprehensive installation guide. *One item of note, professional installation is highly recommended*
Step 1: Dissassemble Crate
Cut metal strapping, and remove all screws to break down the wooden crate, including side walls, for easy access to items. Pull out all components and accessories first, along with foam packaging.
Step 2: Move the Fire Pit Into Place
Carefully carry the fire pit into place (at least two strong people are recommended). The gas stub is to be positioned inside the base. Adjust leveling feet as needed. Carry pieces separately if your fire pit has a bottom and overhanging top. When moving the base, keep the top on a protected surface, such as a drop cloth.
Step 3: Gas Hookup
Have your gas specialist connect the component system. The gas line connection is within the shell of the fire pit, and the pan and burner are placed in the recess opening. Please see the Warming Trends manual included for detailed instructions.
Step 4: Arrange Lava Rock
Small lava rock media is meant to cover the entire concrete recess area and pan. Make sure not to cover the ports of the burner. Then, assemble large lava rock in a pyramid stack allowing gaps for the flame to travel through. See included diagram.
Step 5: Light It Up and Enjoy!
This is the easy part. Just sit back and relax.
Accessories:
Windguard: Screw clips on the glass to connect pieces. Clips with rubber feet will be installed on the bottom to rest on the concrete surface.
Cover: Drape the cover over the fire pit top, covering components, and pull the drawstring to cinch. Never put the cover on the fire pit when the media is still hot.